Projects Reference

PROJECTS 2018

Engineering | Fabrication | Installation

   PTT Field:

  • GBN-WRK-16006,8 Fix Leak On Fire & Repair Line 3
  • WP1,11 GBN-MOD-17040 Boat landing repair
  • GBN-FI-18079 Replace rigging gears
  • ART-MOD-17013 Virtual AIS installation
  • GBS-MOD-17004 Relocate and replace Security Camera
  • WP32,WP33,WP,34,WP35,WP36,WP37,WP38 GBN-MOD-17001 BC exhaust pipe
  • ART-MOD-18014 APP F&G Coverage Modification

   CPOC Field:

  • MDPP Startup Gas Facility Piping Installation
  • Mooring Buoy – Inspection & Reconditioning
  • MDPP Startup Gas Facility Piping Installation

   Other Field:

  • SLB Silo Demobilization
  • TTM Pipe displacement rectification
  • TTM GRF Receiver Internal Pipe Cleaning
  • TTM Replacement Temperature skin sensor of hot oil heater
  • TTM Pipe displacement rectification
  • TTM Pipe Installation Services at Demin Water Package
  • OWA Fabrication Diver Ladder and Mezzanine Platform with Stair
  • QUALITRADE Fabrication Spreader Beam for GAD15794

Blasting & Painting

   PTT Field:

  • GBN-WRK-17029 Painting Campaign WP8
  • GBN-WRK-17029 Painting Campaign WP11

   CPOC Field:

  • Provision of Coated Joints Painting
  • To service the 13-3/8″ Nipple ,68#, Fox to Blasting & Painting (Coated joints)

PROJECTS 2017

Engineering | Fabrication | Installation

   PTT Field:

  • GBS-MOD-1521 GBS MemGuard Adsorbers (2D‐3625 3627)
  • GBN-WRK-16026 Boat Landing Repair
  • Modify and installation runway beam at 20 ft container
  • GBN-MOD-16003 Complex small bore piping support rectification
  • GBN-MOD-16016 Remove corroded transformer& modify electrical distribution system
  • GBN-FI-17013 FI’s Activities During year 2017
  • GBN-WRK-17014 & GBN-MOD-17019 Onshore Fabrication
  • ART-MOD-16006 Onshore Fabrication for Trail Test at AWP27
  • GBN-MOD-16024 To replace of PTT CI Injection system of 32GEP with new types
  • Proof Load Test Painting & Additional Fork pocket at Bottom body
  • GBN-MOD-17028 Barge Bumper Removal
  • GBN-WRK-17010 WP11 Defective Tabular Hanger
  • GBN-WRK-17015 WP03 Boat Landing Subsea Fender Reparation
  • Ship collision protection structure and Damaged Offloading Platform

   CPOC Field:

  • Aviation fuel line damaged sections replacement
  • Anti-Slip Cover for Staircase
  • 2017 Modification Campaign Package 1 (Structure) & Package 2 (Mechanical).

   Other Field:

  • TTM Maintenance Service for driven of flotation unit 1118-Y-01 and 1118-Y-02
  • TTM Lightning Protection and Grounding System Inspection Service
  • TTM Replace Valve HV578 and HV1971
  • TTM Engineering Service for Contaminated Water Transfer Pump (1118-P-12 A B C D)
  • TTM MRP Painting Coating work
  • TTM Corrosion Maintenance Service of Sale Gas Compressor Unit
  • PLUS Perform HAZOP for SCR project
  • ANDAMAN Fuel Gas Heater
  • TOS Power Tool Cleaning and Painting On Boom Crane

PROJECTS 2016

Engineering | Fabrication | Installation

  PTT Field:

  • GBN-MOD-1513 WP14 Boat Landing Repair
  • GBN-FI-15138 To repair and replace badly corroded grating and handrails
  • GBN-WRK-1522 RE-Route Non-Hazardous Pipe
  • GBN-FI-15147 To Badly corroded on PP drain deck piping network
  • THC15-5155 Provision of Well Hook up Services
  • EOPRS refurbishment
  • GBN-WRK-1523 Repair IGG#1 Internal Shell
  • GBS-MOD-1519 GBS Shut Down Package
  • Installation of a Rolling Shutter
  • GBN-MOD-1424 Pilot Test of Recovery Condensate
  • GBS-MOD-16003 Relocate bottom vessel clips of Memguard external support
  • GBN-FI-16035 To rental & maintenance general tools and equipment
  • ART-MOD-1605 Reroute and replace the corroded drain line
  • Repair wood pallet and modify forklift extension
  • BC Gas Engine Removal And Installation
  • GBS-WRK-1505 To Fabricate Install Bund And Selter
  • GBN-FI-16001& GBN-FI-16206 To supply material with painting
  • GBN-WRK-16021 Online Pressure Monitoring System
  • WP2 GBN-WRK-16027 To install support
  • Selective Catalyst Reduction System

   CPOC Field:

  • New Coated Joints
  • JKA Helideck Safety Net and Hatch Covers
  • Provision of Manpower Equipment for MDC Flow line

   Other Field:

  • ZEECO GBN-WRK-1416 Repair welding defects
  • Overhaul DPCU
  • TTM CUI-Recoating Service for Process piping
  • TTM 16 1118-P-03 at WWT and 1108-D-01 at Hot Oil
  • TTM Replace Junction Box of POV
  • IRPC Spent Caustic Treatment Unit

Blasting & Painting

   PTTEP Field:

  • THC16-5091 Splash joint blasting and coating

PROJECTS 2015

Engineering | Fabrication | Installation

   PTTEP Field:

  • Fabrication of Casing Guide Clamp
  • GBS-WRK-1404 Platform signboards
  • DBS 13-15 To improve the PAGA coverage
  • GBS-MOD-1323 Convert temporary platform
  • GBS-MOD-1401 PPS,WPS1 Flame Detectors
  • Installation casing guide clamp AW22
  • ART-MOD-1331 V-4060 Further internal vessel modification
  • ART-MOD-1424 To extend the adjustable weir
  • GBS-MOD-1333 WPS2,WPS4,WPS5 : Relocate GBS Wi-Max
  • ZPQ – Material Supply, Freight & Fabrication Service
  • GBN Campaign 24 Bundled Projects
  • DAA-12003 Install External Flush
  • GBS-MOD-1406 To modify utility connection line
  • ART-MOD-1423 To install isolation vale
  • EOPRS Spare part (Replaced 107P-12 and 203P-12)
  • FI-058-15 To replace badly corroded pipe spool
  • GBS-WRK-1502 Scaffolding Materials
  • GBS-MOD-1329 To Modify Tube
  • Assistance of Pre-Com at GBS WPS11,WPS12,WPS13,WPS32,WPS33,WPS34 & WPS35
  • GBS-MOD-1423 To Convert BKS-1B Gas Producer Well
  • GBN-FI-1572 To repair & replace badly corroded steel structure
  • GBS-MOD-1340 To modify matrix mechanical vibration switch

   CPOC Field:

  • Repair for crack 1 Drain line flange sale gas
  • MDE 13 Well Hook-Up and Commissioning
  • Provision of installation and commissioning support for ATU
  • Hook up & Commissioning of MOD-14-122123 and MOD-12-080
  • Maintenance of Wire Rope Slings 1400 sets
  • Ultrasonic Flowmeter Installation on MDPP MOD 11-038, MOD 12-071
  • Provision for GRE Piping Repair – NOV Bonstrand

  Other Field:

  • CAE Potable Water Distribution Network Revamping
  • KENCANA Hook up & Commissioning of  MOD-14-122123 and MOD-12-080
  • TESCO Fabrication Duplex Pipe Spool & Hydrostatic Test
  • ERA A-Frame fabrication and offshore installation
  • KENCANA EVA Project Rectification of Defect Faulty Items
  • EJJV Service insulation materials
  • PANALPINA Repair brake multi disc and repair colour boom crane

PROJECTS 2014

Engineering | Fabrication | Installation

   PTTEP Field:

  • DAA 13-003 Install LALL and SDV on water Boot of V-1810 US of LCV-1813
  • DAA 13-011 To install drain pots for flow transmitters of water injection pumps at AWP1
  • DBS 13-16 Increasing QPS beds from 160 to 200 (Part Electrical)
  • Bongkot Phase 3L Well Hook-Up at WP30,WP31
  • Bongkot Phase 3M Well Hook-Up WP32,WP33,WP34,WP35
  • FI-1795 To repair and replace badly corroded of piping spool
  • BCD Project for Contractor DCS Remote I-O Panel Installation
  • Bongkot Condensate Debottlenecking
  • FI-1663 Fabricate and supply pipe spools to support BC on WP
  • ECM-13-0234 Arthit Deep Drawn Booster Compressor
  • WRB-13 02 To replace corroded first pipe spool from X-mas tree of BK-1E
  • GBN 1404 WP7,WP13 Boat Landing & Barge Bumper Repair
  • DBA 13-01 To modify PSHH and PSV set point (WP4 WP12)
  • GBN-WRK-1402 To provide new lot of scaffolding board for Bong
  • DAA 12-048 Fabrication and Installation of Permanent Rain Protection
  • TBA 08-37 To re-install diesel oil pump P-5810
  • DBS 12-06 Install piping to route liquid from wet gas filter
  • DAA-13 008 Rerouting VRU Discharge Scrubber Drain Line (APP)
  • DBS 12-015 Additional Outdoor Telephone at PPS Air Cooler Deck 10:27 5 MB
  • Arthit 9 Tote Tanks Proof Load Test & Painting & Permanent wood piece
  • 16 GBN tote tanks 3rd Party load test painting and marking
  • Fabricate Tool Container for Arthit Mechanics
  • GBN-WRK-1311 Pipe Support Removal and Paint Repair Pipe Condensate Line at FSO2

   CPOC Field:

  • Fabricate Knock Out Pot for Liquid Drain Out
  • JKA Helideck Corrective Action for Shutdown
  • Fabricate additional Instrument Fitting for instrument device
  • Welding manpower support for desander skid installation
  • Gangway Installation For AWB Falcon Chief
  • MOD 11-054 Fabricate Portable Platform and Stainless Steel Ladder
  • Urgent to take Pipe Spool MDE 03 to repair
  • Fabricate MDC-02 Flowline
  • To perform cutting & welding pipe spool for CPOC
  • Damage 2 ea of PSV Bleed Ring to send for refurbishment RE PSV Bleed ring crack

   Other Field:

  • KENCANA JDA Gas Balancing Evacuation
  • KENCANA Greenfield Scope of EVA
  • TTM Pigging Project-SAFETY TRAINING
  • CHEVRON Site Survey Electric System at OWS
  • CHEVRON Electrical System for Completion Shop
  • CHEVRON Electrical System for Welding Shop
  • CHEVRON Electrical System for Main Sho
  • CHEVRON Electrical System for Warehouse Shop
  • OIL STATE Dog Plate and Pad Eye
  • ANDAMAN 10ft Offshore Containers